Talentd/FleetCode/Problems/

1225. Report Contiguous Dates

Hard
Read SolutionWatch Video

1225. Report Contiguous Dates

Hard56.9% AcceptancePremium
PremiumFree on FleetCode

Table: Failed

+--------------+---------+
| Column Name  | Type    |
+--------------+---------+
| fail_date    | date    |
+--------------+---------+
fail_date is the primary key (column with unique values) for this table.
This table contains the days of failed tasks.

Table: Succeeded

+--------------+---------+
| Column Name  | Type    |
+--------------+---------+
| success_date | date    |
+--------------+---------+
success_date is the primary key (column with unique values) for this table.
This table contains the days of succeeded tasks.

A system is running one task every day. Every task is independent of the previous tasks. The tasks can fail or succeed.

Write a solution to report the period_state for each continuous interval of days in the period from 2019-01-01 to 2019-12-31.

period_state is 'failed' if tasks in this interval failed or 'succeeded' if tasks in this interval succeeded. Interval of days are retrieved as start_date and end_date.

Return the result table ordered by start_date.

The result format is in the following example.

Example 1:

Input: 
Failed table:
+-------------------+
| fail_date         |
+-------------------+
| 2018-12-28        |
| 2018-12-29        |
| 2019-01-04        |
| 2019-01-05        |
+-------------------+
Succeeded table:
+-------------------+
| success_date      |
+-------------------+
| 2018-12-30        |
| 2018-12-31        |
| 2019-01-01        |
| 2019-01-02        |
| 2019-01-03        |
| 2019-01-06        |
+-------------------+
Output: 
+--------------+--------------+--------------+
| period_state | start_date   | end_date     |
+--------------+--------------+--------------+
| succeeded    | 2019-01-01   | 2019-01-03   |
| failed       | 2019-01-04   | 2019-01-05   |
| succeeded    | 2019-01-06   | 2019-01-06   |
+--------------+--------------+--------------+
Explanation: 
The report ignored the system state in 2018 as we care about the system in the period 2019-01-01 to 2019-12-31.
From 2019-01-01 to 2019-01-03 all tasks succeeded and the system state was "succeeded".
From 2019-01-04 to 2019-01-05 all tasks failed and the system state was "failed".
From 2019-01-06 to 2019-01-06 all tasks succeeded and the system state was "succeeded".
Asked by 2 companies
Similar Questions

Loading editor...

{"headers":{"Failed":["fail_date"],"Succeeded":["success_date"]},"rows":{"Failed":[["2018-12-28"],["2018-12-29"],["2019-01-04"],["2019-01-05"]],"Succeeded":[["2018-12-30"],["2018-12-31"],["2019-01-01"],["2019-01-02"],["2019-01-03"],["2019-01-06"]]}}