Sponsored
Sponsored
This approach uses a dynamic programming strategy to determine the minimum cost. The idea is to leverage a DP array where dp[i] represents the minimum cost to paint up to the i-th wall. For each wall, we decide whether to use only the paid painter or to also utilize the free painter effectively when paid painter is occupied.
Time Complexity: O(n^2), Space Complexity: O(n)
1function minCost(cost, time) {
2 const n = cost.length;
3 const dp = Array(n + 1).fill(Infinity);
4 dp[0] = 0;
5
6 for (let i = 0; i < n; i++) {
7 let occupied = 0;
8 for (let j = i + 1; j <= n; j++) {
9 if (occupied >= time[i]) {
10 dp[j] = Math.min(dp[j], dp[i] + cost[j - 1]);
11 break;
12 }
13 occupied += time[i];
14 }
15 }
16 return dp[n];
17}
18
19// Example usage:
20const cost = [1, 2, 3, 2];
21const time = [1, 2, 3, 2];
22console.log(minCost(cost, time));
In JavaScript, this solution implements a dynamic programming approach with an array to evaluate and update the lowest cost progression while considering the optimal use of available painters.
This approach leverages a greedy strategy, prioritizing the choice that minimizes cost per time unit. By sorting or considering smallest cost per time unit, we attempt to reach a solution that overall minimizes the total cost.
Time Complexity: O(n log n), Space Complexity: O(n)
1def
This Python solution employs sorting based on cost/time ratios to prioritize which walls to paint. The greedy selection ensures we minimize the cost by picking efficient orders.